HAMILTON SUNDSTRAND SUPPLIER PRODUCT-RELEASE PROGRAMS

Size: px
Start display at page:

Download "HAMILTON SUNDSTRAND SUPPLIER PRODUCT-RELEASE PROGRAMS"

Transcription

1 HAMILTON SUNDSTRAND SUPPLIER PRODUCT-RELEASE PROGRAMS APPROVALS: Olena Doughman (RS) PREPARED BY: O. Doughman Kerry Duzan SUPPLIER QUALITY & DEVELOPMENT: K. Duzan Lee Annecchino SUPPLY MANAGEMENT: L. Annecchino DATE: 1/3/13_ DATE: _12/18/12_ DATE: 1/3/13 D. Veilleux DATE: 2013/01/08 ENGINEERING RECORDS: D. VEILLEUX THIS DOCUMENT IS THE PROPERTY OF UTC AEROSPACE SYSTEMS. YOU MAY NOT POSSESS, USE, COPY OR DISCLOSE THIS DOCUMENT OR ANY INFORMATION IN IT, FOR ANY PURPOSE, INCLUDING WITHOUT LIMITATION, TO DESIGN, MANUFACTURE OR REPAIR PARTS, OR OBTAIN ANY GOVERNMENT APPROVAL TO DO SO, WITHOUT UTC AEROSPACE SYSTEM S EXPRESS WRITTEN PERMISSION. NEITHER RECEIPT NOR POSSESSION OF THIS DOCUMENT ALONE, FROM ANY SOURCE, CONSTITUTES SUCH PERMISSION. POSSESSION, USE, COPYING OR DISCLOSURE BY ANYONE WITHOUT UTC AEROSPACE SYSTEM S EXPRESS WRITTEN PERMISSION IS NOT AUTHORIZED AND MAY RESULT IN CRIMINAL AND/OR CIVIL LIABILITY. Page 1 of 43

2 TABLE OF CONTENTS Section Description Page 1.0 PURPOSE SCOPE RANDON AUDIT PROCESS AUTHORIZED TO RELEASE PROCESS ALTERNATE TO ATR PROCESS ORDER OF PRECEDENCE DEFINITIONS AUTHORIZATION TO RELEASE (ATR) BULK PACKAGING 3.3 CONTRACT QUALITY ASSURANCE REPRESENTATIVE (CQAR) DEFECTIVE PART PER MILLION DEFECT (DPPM) RATE DESIGNATED QUALITY REPRESENTATIVE (DQR) ELECTRONIC SOURCE INSPECTION LAPTOP KIT (e-silk) ELECTRONIC SOURCE INSPECTION RECORD (ESIR) FIRST ARTICLE INSPECTION REVIEW (FAIR) MONTHLY ROLLING AVERAGE NOTIFICATION OF POTENTIAL QUALITY ESCAPE (NOPQE) PRODUCTION PART APPROVAL PROCESS (PPAP) SUPPLIER QUALITY REPRESENTATIVE (SQR) RANDOM AUDIT PROCESS RANDOM AUDIT FREQUENCY FOR EXISTING SUPPLIERS DPPM RATE ADJUSTMENTS TO AUDIT FREQUENCY SOURCE INSPECTION AUTHORIZATION TO RELEASE (ATR) PROCESS REQUIREMENTS e-silk ACCESS ATR REQUIREMENTS DQR CANDIDATE SELECTION DQR TRAINING DQR APPROVAL PROBATIONARY PROCESS FOR NEW DQRs DQR AND ATR SUSPENSION 12 Page 2 of 43

3 TABLE OF CONTENTS (continued) Section Description Page 5.8 DQR REACTIVATION DQR RESPONSIBILITIES DQR PROCESS DQR RECERTIFICATION PROCESS P. O. TYPES NONCONFORMING MATERIAL DESIGN CONTROL PART STAMPING/SPECIAL MARKING REQUIREMENTS APPLICABLE DOCUMENT REVISIONS RAW MATERIAL/SPECIAL PROCESS CONTROLS VERIFICATION OF PURCHASED METALLIC RAW MATERIAL` HS APPROVED SPECIAL PROCESSES AND NDT REQUIREMENTS APPROVED SPECIAL PROCESSES NADCAP ACCREDITATION REQUIREMENTS MATERIALS TESTING LABORATORY REQUIREMENTS NON DESTRUCTIVE TESTING (NDT) LEVEL 3 REQUIREMENTS PROCESS CERTIFICATION REQUIREMENTS PROCEDURE TEMPORARY KEY CHARACTERISTICS (TKC) PROCEDURE SURVEILLANCE CONTROL SWITCHING RULES SUPPLIER GOLD LEVELS PRODUCTION PART APPROVAL PROCESS SUPPLIER CONTRACT REVIEW PPAP 1 REVIEW PPAP 2 REVIEW SUPPLIER REQUEST FOR INFORMATION 36 APPENDIX 1 DISTRIBUTOR COMMODITY REQUIREMENTS 37 APPENDIX 2 SURVEILLANCE CONTROL SWITCHING RULES 38 APPENDIX 3 PROCESS CERTIFICATION: OPTION 2 SITE SPECIFIC CONTROL PLAN AND DATA REPORTING PROCESS 39 Page 3 of 43

4 1.0 PURPOSE Hamilton Sundstrand The purpose of this document is to provide additional Quality Systems requirements that are not contained in the United Technologies Corporations ASQR-01 Aerospace Quality Requirements. In addition, it defines the Supplier requirements for the Hamilton Sundstrand Designated Quality Representative Program. Note: This specification does not apply to the Windsor Locks Space Systems business entities. 2.0 SCOPE 2.1 RANDOM AUDIT PROCESS The Random Audit process applies to all HS suppliers using the e-silk system to release product. Supplier product random audits are based on supplier s 3 months rolling average (DPPM) and range from total self-release to 100% over-inspection as referenced in section 4.0. These inspections shall be performed at the suppliers facility by HS approved source inspectors, DQR s, or CQAR s. Random Audit Process Inspection requirements are in addition to sampling requirements flowed down to suppliers in the ASQR 20.1 Supplier Sampling Requirements. 2.2 AUTHORIZED TO RELEASE PROCESS The Authorized to Release (ATR) process is applicable to suppliers that provide product to HS facilities or drop ship product to HS suppliers or customers. ATR Suppliers must use the ATR process for all HS product shipments, including supplierto-supplier, supplier to-distributor, distributor-to-distributor, and supplier to Strategic Logistic Center (SLC). Previously HS approved DSQR Suppliers will be recognized as meeting DQR status. The procedures presented herein are general and may be tailored for individual program requirements or to fit unique Supplier/HS relations. ATR terms and conditions shall be documented in a Letter of Agreement (Form 8) between the supplier and HS. Direct ship authority will be granted by HS on a separate Letter of Agreement. 2.3 ALTERNATE TO ATR PROCESS Suppliers not approved for the ATR Process are required to request source inspection services per instructions located on the HS Supplier Portal. This required overinspection service will be at the supplier s expense. In addition to ASQR-01 Aerospace Supplier Quality Requirements noted on your purchase order, only the following sections of HSM17 apply: Page 4 of 43

5 2.3 ALTERNATE TO ATR PROCESS (continued) Hamilton Sundstrand Order of precedence per paragraph through Use of CQAR (third party source) or Receiving Inspection Non conforming material per paragraph Design Control per section Special Marking Requirements per section Applicable Document revisions per Raw Material and Special Process Control per sections 6.0 and ORDER OF PRECEDENCE The order of precedence, in circumstances of conflicting requirements, shall be: Contract (i.e. Purchase Order, Long Term Agreement) Drawing Referenced HS Specifications Referenced Specifications This procedure (HSM17) 3.0 DEFINITIONS 3.1 AUTHORIZATION TO RELEASE (ATR): A process that authorizes a supplier s representative (DQR) to act as an agent of HS who may perform process audits, product inspection, acceptance, and release. Hamilton Sundstrand s ATR process is documented through esilk. 3.2 BULK PACKAGING: Parts too small to be individually stamped. Typically high volume, low cost, manufactured or specifically designated parts (i.e. bag of industry standard washers, nut, etc.). 3.3 CONTRACT QUALITY ASSURANCE REPRESENTATIVE (CQAR): Contract Quality Assurance Representatives approved by HS (third party) to perform duties and responsibilities of HS Supplier Quality Assurance (SQA). CQAR s (formerly referred to as Unitek Representatives) are assigned HS acceptance stamps, and are delegated product acceptance or release authority. Page 5 of 43

6 3.4 DEFECTIVE PART PER MILLION DEFECT (DPPM) RATE: DPPM is a metric used to determine a supplier s performance based on receipt and acceptance of product, and is calculated as follows. Number of Pieces Rejected DPPM = 1,000,000 Number of Pieces Received 3.5 DESIGNATED QUALITY REPRESENTATIVE (DQR): A supplier representative (employee) approved by HS to perform Source inspection, corrective action and related duties (formerly referred to as DSQR s). 3.6 ELECTRONIC SOURCE INSPECTION LAPTOP KIT (e-silk): e-silk is an internet web-based method to communicate to Suppliers, SQRs and others current contractual requirements for Purchased Parts. It collects data necessary to release product (Lot Date Codes, Serial Number, Key Characteristics, Materials, etc.) and makes information readily available for use. It provides for direct shipment to point of use, bypassing RI and Material Lab, triggers payment, Supplier Ratings and other systems. 3.7 ELECTRONIC SOURCE INSPECTION RECORD (ESIR): An ESIR is an Inspection Record generated by approved individual using the e-silk application. The record applies to a specific quantity of parts inspected at a given time and provides the status of inspection approval based on provided requirements. 3.8 FIRST ARTICLE INSPECTION REVIEW (FAIR): A First Article Inspection is to give objective evidence that all engineering, design, and specification requirements are correctly understood, accounted for, verified, and recorded. First Article Inspection Reviews shall be performed in accordance with SAE AS9102 and any additional requirements detailed in ASQR01. Page 6 of 43

7 3.9 MONTHLY ROLLING AVERAGE: Hamilton Sundstrand Monthly Rolling Average is calculated using the average of the PPMD value for each of the months specified. For example, a 3 Month Rolling Average would average the current and two preceding months DPPM value NOTIFICATION OF POTENTIAL QUALITY ESCAPE (NOPQE): NOPQE is an escapes management process to report potential product nonconformances and document relentless root cause and corrective action. UTC Form 6 is used to document supplier nonconformances found at a suppliers facility. Supplier to send in NOPQE via the Supplier Request for Information system PRODUCTION PART APPROVAL PROCESS (PPAP): PPAP is simply a series of analyses of various aspects of a production manufacturing process. The purpose of this process is to provide evidence that UTC member engineering design, record and specifications requirements are properly understood and fulfilled. The goal is to demonstrate the established manufacturing process has the potential to produce product that consistently meets all requirements at the intended production rate SUPPLIER QUALITY REPRESENTATIVE (SQR): An SQR is an individual performing functions as defined by this procedure as well as applicable HS procedures. There are three types of SQR s used by HS, they include: Supplier Quality Assurance Representatives (SQAR), HS or UTC employee Contract Quality Assurance Representatives (CQAR), Contract Employee Delegated Quality Representative (DQR), Supplier s Employee 4.0 RANDOM AUDIT PROCESS 4.1 RANDOM AUDIT FREQUENCY FOR EXISTING SUPPLIERS Product acceptance audits conducted by the DQR are controlled by the random audit process through e-silk. The frequency of random audits is based on the supplier s performance identified as a three (3) month rolling average. Each manufactured lot of shipped product is subject to the random audit logic (Table 1). Suppliers will be notified when an audit is required when using the e-silk application. Refer to for Over- Inspection Audits. Page 7 of 43

8 Table 1 Hamilton Sundstrand HS Supplier Random-Audit Model Audit Level DPPM Range Lot Inspection Probability A <500 Supplier Self Release B 501-1,500 1 in 30 C 1,501-3,000 1 in 25 D 3,001-4,000 1 in 20 E 4,001-7,500 1 in 15 F 7,501-10,000 1 in 12 G 10,001-15,000 1 in 10 H 15,001-25,000 1 in 7 I 25,001-50,000 1 in 5 J >50, % Example: a supplier in audit level B will have a 1 in 30 chance of being audited for each lot to be delivered. Because this is a random process, it is possible to have no audits for several months or to have several audits sequentially. As the number of shipments increases, the frequency rate can be proven to be statistically sound. 4.2 DPPM RATE The assigned random audit level is based on a three-month rolling average updated monthly. This data is available to users operating e-silk. This is a self-adjusting system. As a supplier s quality improves, the audit frequency will decrease. If a supplier s quality deteriorates, the audit frequency will increase. Random audit frequency is assigned per TABLE 1 once a baseline DPPM rate is established. The ongoing DPPM rate is developed from data used in preparing the monthly HS supplier report card. Contributors to the Supplier DPPM rate are: SQAR, CQAR, and Receiving Inspection non-conformances Reverse flow (non-conforming parts) off the shop floor Customer returns Non-conformances validated as supplier responsibility Note: CAD's do not affect the Supplier s DPPM rate. 4.3 ADJUSTMENTS TO AUDIT FREQUENCY Adjustments to the Audit Frequency can be attributed, but not limited to the following: Page 8 of 43

9 4.3.1 Rejection of one lot requires the DQR to inspect the nonconforming characteristic 100% for the next 3 manufactured lots of the same part number to ensure corrective action has been implemented, and is effective in elimination of non-conformances Delinquent corrective action response Detection of Quality System deficiency High Pain Escape to OEM customer 4.4 SOURCE INSPECTION When a supplier must have HS perform source inspection (SQAR or CQAR), the supplier must request source inspection services per instructions located on the HS Supplier Portal under Help/Quality Training Materials First Article Releases for Flight Safety Product must be approved by a Hamilton Sundstrand Employee (SQAR). Subsequent releases of Flight Safety Product can be performed by the DQR. 5.0 AUTHORIZATION TO RELEASE (ATR) PROCESS REQUIREMENTS 5.1 e-silk ACCESS Supplier self-release requires Internet access and web site access to HS s Supplier Home Page. For all self-released product, the supplier shall complete an electronic source inspection record (ESIR) using e-silk. Note: The use of e-silk supersedes the need to complete a Verification and Product Release Record (UTCQR Form 5) Note: ESIR s are acceptable substitutes for Certificates of Conformance, ASQR-01 Form 4, and Format A Form. 5.2 ATR REQUIREMENTS ATR Supplier Selection To be considered for the ATR Program, a supplier must meet the following criteria: Be listed on the current HS Quality Approved Supplier List Page 9 of 43

10 Be under the cognizance of the Supplier Quality Assurance organization Have a satisfactory or better rating for the last system audit or have an approved corrective action plan for the last system audit Hold a valid AS9100 certificate per the ASQR-01 requirements for manufacturers or AS9120 certificate per theasqr-01 requirements for distributors ATR Supplier Approval To be approved for the ATR Program, the supplier shall: Select qualified employees from the quality department considered competent to perform the required duties of a DQR. The number of DQRs approved for a specific supplier shall be commensurate with the workload and appropriate contingency factors (vacation, holidays, illness, shift coverage, fluctuations in PPM, First Article audits, etc.) When the supplier cannot provide DQR coverage, the supplier is responsible for charges that may occur through the use of a third party agency (CQAR) under Hamilton Sundstrand s control. It is highly recommended a minimum of two DQRs be available at all times for all HS Suppliers. One DQR will serve as the Primary, taking overall responsibility for the program, with all others serving as alternates ATR Supplier Requirement Notify the HS Help Desk ( ) when a DQR is leaving their position. 5.3 DQR CANDIDATE SELECTION Minimum qualifications for candidates are: Employee of the supplier Needs to report organizationally through Quality. Page 10 of 43

11 5.3.3 Yearly eye exams by certified eye professional (e.g. optometrist, certified company nurse) per requirements of ASQR-01 with objective evidence to be kept on file at the supplier. The requirements detailed in ASQR-01 must be followed for each type of inspection performed A minimum of (6) six months experience with HS product, specification, and drawing requirements A minimum of (1) one year experience in the inspection field or Quality environment. This requirement may be shortened depending on the candidate s overall Quality Control background and prior experience with HS product The ability to read, write and understand English Complete, sign, and submit a Letter of Agreement (LOA), UTCQR Form 8, for each candidate, to HS SQA Management for approval Submit a completed DQR Candidate Form via fax to HS SQA Management for approval. Use the HS version of UTCQR Form3 dated 11/04. Note: All forms / documents must be in English. Note: These requirements can be tailored by HS SQA Management depending on the experience of the potential DQR candidate, and/or commodity being supplied. 5.4 DQR TRAINING DQR Training will be completed on-line using the Supplier Home Page and e-silk tutorial. As a minimum, the training will consist of acquiring a thorough knowledge of all applicable HS procedural requirements, purchase orders, engineering drawings (change levels), specifications, product specific quality plans, quality system requirements, approved special processes and e-silk. The DQR candidate will be tested and must achieve an 80% minimum test score prior to being approved by HS SQA Management. Note: Three attempts are allowed to successfully pass the test. After failing three attempts candidate must request onsite training from the SQAR. SQA management reserves the right to deny applicant to move forward with DQR privileges. Page 11 of 43

12 5.5 DQR APPROVAL Hamilton Sundstrand Upon approval, HS will return signed copies of Form 3 and Form 8 with an electronic stamp (DQR number). The applicable HS SQAR will be the prime contact for any questions or issues that may arise during the performance of the DQR s duties. Training will be provided to keep DQRs up to date with the latest document, procedure, and requirement changes as it affects the performance of the DQR s duties during the DQR Audit. Note: Once all DQR documentation has been received and test completed SQAR reviews the candidate to give final approval to advance to probationary period. 5.6 PROBATIONARY PROCESS FOR NEW DQRs New DQRs are authorized to only generate an (M) code e-silk This shall be in effect for an initial probationary period of approximately six months and will require a second person verification to release the (M) coded traveler. Verification can be performed by one of the following: - A non-probationary DQR at the site - A HS Supplier Quality Assurance Representative (SQAR) - A Third Party Source Inspector (CQAR) The six month probation can be modified at the discretion of HS SQA Management A DQR review is required for a DQR to be released from probation. Contact your HS SQAR to schedule this review. Note: SQAR gives approval for the DQR to be removed from probation. 5.7 DQR AND ATR SUSPENSION At the discretion of HS SQA Management, a supplier may be suspended from the ATR program at any time. Suspension applies only for product procured by or for HS. Suspension from the ATR Program will take place when any of the following occur: HS determines SQR coverage is no longer required. Page 12 of 43

13 5.7.2 Actions taken by the supplier or DQR are detrimental to the best interest of HS If it is determined e-silk identifications and passwords are shared with other employees No DQR activity occurring in a 12-month period failure DQR address and e-silk user id must be the same High pain escape to OEM customer. 5.8 DQR REACTIVATION A DQR who has not created an ESIR in over two years will have to retake the DQR test DQR could be placed on a conditional probation Submit proof of current eye exam. Follow requirements detailed in ASQR-01 and the DQR Candidate Selection section above Restore access to HS Supplier portal Onsite SQAR to ensure DQR is adequately trained. 5.9 DQR RESPONSIBILITIES General DQR responsibilities include: Perform all production product releases through e-silk Release all material in accordance with HS procedures and specifications Clearly state the Engineering Change revision of the part. Entering NC for no change or - as the EC Revision is not allowed. For example; if the revision is listed as *, enter * in the EC revision field in e-silk, if the revision is listed as B, then enter B in the EC revision field in e-silk. Page 13 of 43

14 5.9.4 Perform inspection on a minimum of 3 pieces and 5 characteristics (unless lot size or characteristics are less) for all Master Lots. The characteristics selected shall vary for each lot, and characteristics over-inspected must be recorded in esilk. The DQR shall not be the same associate who performed the final Inspection for the P/N listed on the PO being released in esilk (ASQR-20.1 inspection). Note: In the event the supplier is performing SPC, do not choose a characteristic that has a CPK greater than Verify all applicable material related test requirements are met prior to initial release of any part. When required, subsequent testing will be imposed by purchase order or by specification Verify HS approved suppliers for Process/Material Specifications identified on on Report 80 and Report 85 are used. (See Table 2 of this document for guidelines.) Note: Listing of approved/restricted Process/Material Suppliers (Report 80 and 85) is available on the HS Supplier Portal Approve material for shipment by completing applicable forms and affixing stamps as required by specific purchase order and HS specification requirements Perform quality-related follow up activities that include, but are not limited to, corrective action resulting from audits, surveys, and nonconforming material escapes Review FAIR per ASQR-01 and document via e-silk release the FAIR fully complies with requirements of ASQR-01. Attach all FAIR documents to the e-silk release as applicable First Article Inspection (FAI) Reports as required by ASQR-01 shall have the AS9102 FAI Form 1 and HS First Article Inspection Report Review Checklist (ref. form QC ) completed by the required personnel as noted in the AS9102, FAI, Form 1, Review by block. When a nonconformance is identified on the FAI Report it will be listed on Form 3 Field 11. The Not Complete box will be checked, and a delta FAI will be required on the next lot of parts to show the characteristic conforms. - Block 21 requires completion by the DQR or authorized quality Page 14 of 43

15 representative, i.e., name of the person from the Organization who approved the FAIR. - Block 22 requires completion in support of approval process noted in block 21, i.e., record the date when the FAIR is approved by the DQR or authorized quality representative. Note: DQR s do not have customer signature authority. DQR s are not authorized to ship product prior to FAIR signature approval by HS, in accordance with para , Note: If you have submitted your FAI to the address noted on your PO AND you have a signed form1 from HS, you do not have to attach Your FAI paperwork, it is electronically on file with HS Maintain original and delta FAIR and associated documentation/certification on file for SQAR review/approval during scheduled DQR audits Attach to the ESIR full conformance to all documentation requirements established by the purchase order and Test Data Package. This shall include, as applicable: C of C s Certifications of Conformance Certifications of materials, sub-tier processes, material testing, etc. Certifications of special processes, including processes provided by sub-tier process suppliers Generation of P (partial acceptance) coded travelers. A P coded traveler should only be generated if additional processes need to be completed. Examples could be additional requirements requested by Hamilton Sundstrand Engineering, Quality or Manufacturing. When (P) coding a traveler, the notes section at the end of the traveler MUST be filled in detailing the reason for (P) coding. It should also include a contact name and number of the Hamilton Sundstrand individual who is responsible for the disposition of the (P) coded traveler DQR PROCESS Note: P code shall only be allowed with the authority of Supplier Quality Assurance. P coded travelers will automatically stop in Receiving Inspection for further evaluation. The DQR will prepare the shipment by completing the e-silk report, assuring completion of all associated documentation, inspections, and tests. Page 15 of 43

16 Over-inspection Audits will be controlled through the online e-silk application. Any subsequent audits must be performed by a different DQR. A second DQR is mandatory to release an Audit ESIR. If a second DQR is not available, contact a CQAR per instruction on the HS Supplier Portal. This shall be at the Supplier s expense Audits will be required when: Management Override exists Random Audit Process imposed by the system During First Article Inspection Review DQR on probation High pain escape to the Customer Flight Safety Hardware Initial Release and subsequent First Article Inspection Reviews can only be performed by an SQAR. Subsequent releases not involving First Article Inspection reviews may be performed by a DQR or CQAR Castings and Forgings Procurement of all Hamilton Sundstrand designed castings and forgings shall be procured from a Hamilton Sundstrand approved supplier. Supplier shall not ship production castings or forgings to Hamilton Sundstrand or another Hamilton Sundstrand supplier without having a written FAIR approval from Hamilton Sundstrand Procurement Quality Assurance (PQA). Suppliers shall notify the Hamilton Sundstrand buyer when a casting/forging FAIR is ready for Hamilton Sundstrand PQA review. All castings requiring radiographic inspection shall be serialized and the x-ray film retained by the supplier per the requirements of ASQR DQR RECERTIFICATION PROCESS Mandatory recertification every two years will be conducted in a formal training session for each DQR. Failure to comply will result in the loss of DQR status. At the conclusion of each recertification class a formal test will be administered. The DQR must pass this test with an 80% or better score. The test can only be taken once. They do not take the test until they pass. If the DQR does not pass the recertification test, their status will be inactive. This means they cannot create an ESIR within the esilk application. They must wait 30 Page 16 of 43

17 days before they can retake the recertification test. If the DQR does not pass on the second attempt, they must contact their SQAR for additional training. They will continue to have an inactive status and must wait an additional 30 days before attempting the test again. Failure to pass the test a third time will result in the loss of their inspection authorization for good. They cannot reapply at a later date. Each new DQR is required to attend a formal training session within their 6 months probation period P.O. TYPE Type of Part ESIR Production (non-repair) such as OP,O9, OD orders Yes Production (repair) OL,OS orders Yes Part getting shipped to another company besides Hamilton Yes Part on an "ON" purchase order (very rare, if ever) No NOTE: CALL HELP DESK WITH QUESTIONS 5.13 NONCONFORMING MATERIAL The supplier shall establish and maintain documented procedures to ensure product not conforming to a specified requirement is prevented from unintended use or installation. This control shall provide for identification, documentation, evaluation, segregation (when practical), disposition of nonconforming product, and for notification to the functions concerned TYPE 1 Nonconformance Nonconforming items of Hamilton Sundstrand design must be dispositioned by Hamilton Sundstrand Material Review Board (MRB) before goods or services are delivered. Type 1 disposition of supplier propriety items or components that could by themselves, or by relation to other components, affect system or end item specification, reliability, weight, safety, and appearance when it is a significant factor, requires approval by Hamilton Sundstrand MRB prior to release. Disposition by Hamilton Sundstrand MRB may be obtained by submitting Conditional Advance Disposition per The supplier shall not proceed with a repair procedure unless authorized by Hamilton Sundstrand MRB TYPE II Nonconformance Page 17 of 43

18 Suppliers approved by Hamilton Sundstrand may perform Type II material review actions on proprietary products provided the subject product was completely designed, developed and funded by the supplier. Type II is defined as any departure from requirements not falling into the category of Type I. These Type II dispositions, when authorized, shall be made available upon Hamilton Sundstrand request. Requests for Type II MRB authority by specific product types (when required) are to be transmitted to Hamilton Sundstrand Procurement via Supplier Request for Information (SRI) available on the HS Supplier Portal. Additional information may be requested by Hamilton Sundstrand such as review and/or approval of the supplier s nonconformance and corrective action procedures, instructions and personnel. Hamilton Sundstrand authorizes the supplier s Type II approval by issuing letter of delegation. The delegation will specify the approval level and any specific restriction or instructions. Supplier s providing standard catalog items or commercial off the shelf (COTS) items are not required to request Type II MRB authority Conditional Advance Disposition (CAD) Requirements If nonconforming material is detected during the manufacturing process that requires accept as is or repair disposition from HS, the Supplier is responsible for ensuring the following: CAD (including cause corrective action) has been generated and submitted to HS s Procurement group. CAD has been disposition and approved by HS. Requested repair activity is completed and conforming to requirements. Supplier has implemented corrective action to address root cause of the CAD. Supplier has implemented corrective action to address root cause of the CAD. ESIR s generated for affected product accurately document CAD activity. CAD material disposition as scrap has been properly mutilated (render unfit for use) at the supplier. Page 18 of 43

19 Note: CAD (form HSF 0857) is available on the HS Supplier Portal DESIGN CONTROL Suppliers with design authority shall establish and maintain documented procedures to control and verify the design of the product in order to ensure the specified requirements in CEP100, Hamilton Sundstrand Supplier Configuration Management Requirements, are met PART STAMPING/SPECIAL MARKING REQUIREMENTS For Cage Code of Product Acceptance Stamp (Oval with last 3 digits of Supplier Code) Product acceptance stamps are used for stamping all product in which the flow down is required by P.O. or all Heritage Hamilton drawings with a cage code of The supplier will need a set of oval stamps for stamping parts. The oval stamp must contain the last three digits of the company s HS primary supplier code. The primary supplier code is the code used on shipments within North America. These stamps should be approximately the same size as the part marking and must be legible. Parts need to be stamped to be in conformance with HS part acceptance requirements. Place stamps using permanent ink in contrasting colors in front of the P/N. Stamp marking may be of the same type as the part marking specified on the drawing. Note: A complete tutorial guide for marking parts can be found on the HS Supplier Portal under Part Marking Identification Aid. For P coded ESIRs, the acceptance stamp shall be placed after the part marking. This indicates that all else is complete No stamps are allowed on General Electric part numbers No stamps are needed on Dynamic Control parts Heritage Sundstrand will flow marking requirements on the P.O Required Stamp Locations Page 19 of 43

20 Place acceptance stamp to the left of the part number except as noted below: Situation Insufficient space No HS Part Number on part Part size too small Bulk Packaging Location of Stamp Above or below HS Part Number Stamp container & associated paperwork Stamp container & associated paperwork Prior HS approval required (Via SRI Process) in order container or associated paper work Examples of Special Marking Requirements for HS Parts Part Status Parts which passed B/P Pressure Test Parts manufactured to unreleased drawings (Identified with X in part number) Parts manufactured for Engineering use only Diamond (TS) parts are not upgradeable Required Acceptance Stamp Mark with Letters PT in permanent ink Locate near part number but slightly separate from it Mark Diamond R at left side of part number Mark Diamond TS at left side of part number No ESIR required with Diamond TS products NDT Stamping Instructions call for identifying NDT acceptance by dye marking Stamp to the right (above or below if space restrictions) lf applied part number or alternately next to any serial number or on a prominent surface Method Pieces Inspected Pieces Not Inspected In Sample Penetrant Maroon Yellow MPI Blue Orange Radiography Blue Orange 5.16 APPLICABLE DOCUMENT REVISIONS Where the Drawing refers to a material, process or inspection specification, drawing or standard that has been revised, cancelled or superseded, the following shall apply: If the Drawing refers to a specific issue or revision of the document, that issue or revision shall be used If the Drawing does not refer to a specific issue or revision of a document, the following shall apply: Page 20 of 43

21 Standard Parts. For standard parts (such as AN, NAS, MS, M, etc.) the part to be used may be any revision in effect prior to cancellation or supersession When utilizing Mil-Std parts a change from MIL-X to MIL-DTL or MIL-PRF is considered a change in the revision letter of the document not a new specification Material, Inspection, Process and Acceptance Specifications If the document has not been cancelled, then only the current revision may be used Where the document is cancelled, with or without supersession, the last issue prior to cancellation or supersession shall continue to be applicable. 6.0 RAW MATERIAL CONTROLS Note: Applies to all suppliers that distribute raw material or manufactures part numbers that contain a material specification on the drawing (except source control, specification control, COTS and standard parts). 6.1 VERIFICATION OF PURCHASED METALLIC RAW MATERIAL Original mill certification or photocopy of original mill certification is required and shall be traceable to raw material lot or batch numbers. When the material specification has been cancelled with or without supersession, the latest issue prior to the cancellation or supersession shall continue to be used. The material must be certified to the material specification specified on the engineering drawing Material procured to a military, federal or industrial specification revision prior to that imposed by the Hamilton Sundstrand purchase order shall be considered acceptable provided the supplier validates the material certification meets all requirements of the latest specification revision If a specified material cannot be obtained; an acceptable alternate material can be identified from the HS engineering drawing 69100, Alternate Parts. If an acceptable alternate material is not listed, the supplier shall submit a written SRI, Supplier Request for Information (ASQR-01 Form 3) to the cognizant HS contact. Page 21 of 43

22 7.0 HS APPROVED SPECIAL PROCESSES AND NDT REQUIREMENTS 7.1 APPROVED SPECIAL PROCESSES All process and material specifications that appear on any HS engineering drawing, and are also listed on Reports 80 & 85, require a HS approved source. Suppliers must use an HS approved supplier (except as noted in Table 2) when a specific material or manufacturing special process is listed in HS Report #80. HS Approved Process/ Material Supplier Report, or be listed as a HS approved supplier in HS Report #85, Supplier Internal Processes Report Report #80: Identifies HS approved suppliers who are capable of providing a special manufacturing process or material in accordance with applicable process/material specifications (e.g., HS, PN, CP, AMS, MIL STDs, etc.), typically as a service provider. Approved sources are listed in ascending order based on the HS supplier code number Report #85: Identifies HS approved suppliers/fabricators who utilize their own captive internal special manufacturing process or material in accordance with applicable process/material specifications (e.g., HS, PN, CP, AMS, MIL STDs, etc.), typically in the production of HS product. 7.2 NADCAP ACCREDITATION REQUIREMENTS Nadcap (National Aerospace and Defense Contractor s Accreditation Program) accreditation is required by United Technologies and Hamilton Sundstrand for all Special Process and NDT processes performed on Hamilton Sundstrand hardware, including processes performed by suppliers or their sub tier suppliers that design and/or manufacture parts for Hamilton Sundstrand. Suppliers shall submit an electronic Supplier Request for Information (SRI) from the HS Supplier Portal to request that a waiver from Hamilton Sundstrand Supplier Quality management when Nadcap accreditation has not been achieved. Special processes include but are not limited to the following: Nondestructive Testing, Heat Treatment, Chemical Processing (electroplating, anodizing, etc), Welding / Brazing, Non-conventional Machining and Surface Enhancement (Shot Peen), and Metal Coatings (Thermal Spray, Vapor Deposition). Suppliers of source control, (except as noted in appendix) shall use Nadcap accredited suppliers for special processes and NDT. Page 22 of 43

23 Reports #80 and #85 can be viewed on the HS Supplier Portal. Note: If a specification is listed in either HS Report #80 or #85, and no HS approved process supplier is listed, then the supplier shall submit an electronic SRI (ASQR-01 Form 3) from the HS Supplier Portal to request an approved process supplier be identified. 7.3 MATERIALS TESTING LABORATORY REQUIREMENTS When specified on the Hamilton Sundstrand Purchase order, any product produced for Hamilton Sundstrand (Aerospace Division) requiring product and/or materials testing shall be performed by a Materials Testing Laboratory listed in Hamilton Sundstrand Report #80, Approved Process/Material Supplier Report. To access the Report #80: Access the HS Supplier Portal Select Supplier Reports tab and then 80/85 tab Select Report #80 from Click here to review Radio button should be set to Specs beginning with Input Laboratories, Independent Approved to specification number field for Metallics or Input Labs, Approved NonMetallic Testing to specification number field for NonMetallics. Other testing required by an engineering drawing and associated technical specification(s) necessary to complete a part shall be performed by supplier s internal lab or any testing source holding a current A2LA, Nadcap, or HS approval. See Approved Special Process Supplier Requirements (Table 2) for specific drawing types. Page 23 of 43

24 Page 24 of 43

25 7.4 NON DESTRUCTIVE TESTING (NDT) LEVEL 3 REQUIREMENTS Suppliers performing NDT processing shall have an on-site NDT level 3 or a corporate/contract Level 3 visit plant site at least every six (6) months unless a written deviation is granted by Hamilton Sundstrand Special Process and NDT management. The corporate/contact NDT L3 responsibility shall be documented in a company procedure and require the corporate/contract NDT Level 3 to perform the following functions as necessary during their plant visit: Perform internal audits of each NDT system and document results. Review Customer contract requirements for NDT. Implement customer requirements into company procedures, instructions and standard work. Review and approve NDT techniques. Assure all NDT certified personnel are trained and certified to the requirements of NAS410 latest revision. Assess Level 2 compliance to company procedures work instructions, & NDT techniques. Train and guide NDT personnel with processing and interpretation. Assure NDT systems and equipment are calibrated and operating properly. Assure all NDT techniques are approved by the company Level 3 and customer approved as required. Assure sample frequencies are correct. All companies are responsible for assuring their verify the NDT Level 3 meets the requirements of NAS 410 latest revision, has taken a general, specific and practical exam in the methods they are overseeing and have a document (signed by upper management) identifying the primary company Level 3. General exams may be waived if the level 3 is ASNT, certified or has objective evidence they have passed a National Aerospace NDT Board (NANDTB) examination. Specific exams shall contain questions pertaining to applicable Industry and Hamilton Sundstrand specifications. NDT Level 3 practical exams shall consist of procedural elements as well as hands on practical equivalent to that of a NDT Level 2. NDT Level 3 recertifications shall be by examination. Page 25 of 43

26 8.0 PROCESS CERTIFICATION REQUIREMENTS Hamilton Sundstrand Hamilton Sundstrand reserves the right to flow down on the engineering specification and/or drawing, characteristics defined as CTQC, CTSC, KPC1 and/or KPC2 that require Statistical Process Control implementation per HSC16199 and ASQR Outlined in the following procedure are the specific actions expected to take place by any Supplier producing HS product that contains one of the aforementioned symbols defined in HSC ) Support Required Manufacturing Process Reviews 2) Define Lower level Key Product Characteristics to Supplier HS Defined CTQCs/CTSCs 3) Identify KPC features on applicable Work Instructions 4) Provide Operator Training 5) Prepare Control Plans 6) Perform Gage Capability Studies 7) Collect and Analyze SPC Data 8) Report Summary Results Prior to Shipping 9) Achieve Certification and Subsequent KPC Sampling Note: Refer to HSC16199 for definitions and detail requirements of CTQC, CTSC and KPC features. 8.1 PROCEDURE MANUFACTURING PROCESS REVIEWS: Supplier will support specific Manufacturing Process Reviews that ensure successful Process Certification implementation for HS defined CTQC, CTSC and KPC features. These reviews include the Key Characteristic Review (KCR) and Process Control Review (PCR). The intent of the KCR is to prepare the supplier for the formal PCR. Its focus is directed at reviewing and training the supplier in all the detail requirements of Process Certification such as: completing a process control plan, performing gage capability studies and data entry requirements via the HS portal. Supplier, as part of the KCR, will submit a Process Certification System Assessment to HS Supplier Quality Assurance used to assess Suppliers ability to implement KPC features adequately. Supplier will support requests by HS SQA to conduct onsite review/training. The PCR is a follow-up to the KCR and is conducted onsite at a Supplier to validate the supplier s Quality System implementation of Process Certification requirements as discussed during the KCR. Supplier will support requests to conduct the PCR at their facility, or, if requested by HS SQA, provide a self-assessment. Page 26 of 43

27 8.1.2 LOWER-LEVEL KPC SELECTION TO SUPPORT CTQCs/CTSCs: In the event HS defines CTQC/CTSC features per HSC16199, Supplier will selfassess and identify lower-level Key Product Characteristics to support the CTQCs/CTSCs which are upper-level in nature. Supplier will perform all the implementation requirements per the following paragraphs for their own self-selected KPCs. While this requirement is specific for suppliers who perform both the design and manufacturing functions, manufacturing only type suppliers are strongly encouraged to self-select KPCs and implement SPC for them per UTCQR-09.1 as a practice highly valued by United Technologies Corporation WORK INSTRUCTION IDENTIFICATION: Supplier will identify HS defined KPC features and/or self-selected KPCs on their work instructions/route sheets/travelers. It shall be obvious to the Operator that KPC features will require SPC activities such as reviewing Control Plans, ensuring Gage Capability Studies are completed, and performing the required SPC data collection using Control Charts OPERATOR TRAINING: Supplier will ensure Operators performing KPC operations will be trained properly in basic SPC techniques such as data collection, use of control plans, reacting to out-of-control points, and where to access SPC data collection tools. DQRs will be additionally trained to know how to enter KPC compliance data into the HS Process Certification Database available on for reporting purposes PREPARATION OF CONTROL PLANS: DQR will ensure the Electronic Control Plan Site Specific Information tab, which is part of the HS Process Certification System available on will be filled out completely for each and every HS defined KPC flowed down to the Supplier. Suppliers are not required to fill out an Electronic Control Plan for self-selected KPCs but must maintain a control plan for them per UTCQR Suppliers are encouraged to use Form QC spreadsheet, available on the hssupplierportal.com Help tab. This form contains a Control Plan format the Supplier may use if needed GAGE CAPABILITY STUDY: The DQR will ensure that a gage Capability Study was completed for any gage used to measure a KPC feature. The DQR will ensure the results are stored on the Site Specific Control Plan, available in the Process Certification Database which is located at The requirement is to achieve a Gage Capability Study result of 20% or less of the total engineering tolerance and a gage resolution of no more than 10% of the total feature tolerance. An Action Page 27 of 43

28 Plan is required when either of the above requirements is not met. If these requirements cannot be practically achieved, a waiver document (KPC Management Form) must be submitted to HS via the HS process Certification System available on Supplier is encouraged to use Form QC spreadsheet that contains the Gage Capability Study Short Form and Long Form methods. Suppliers are encouraged to first use the Short Form as it is quite efficient. If a result greater than 20% occurs, Supplier should conduct a Long Form Study to determine if measurement system error is composed primarily of the instrumentation used or the Operator-to-Operator methodical differences SPC DATA COLLECTION AND ANALYSIS: DQR will ensure that the Supplier has collected SPC data for each KPC on the HS drawing and/or specification, plotted points on a Control Chart, and calculated Control Limits after 25 data points (subgroups) are recorded from the process. DQR will ensure that the statistical control limits, once determined, are applied to the control chart and set permanently until such a point is arrived that recalculation is warranted (i.e., major process change such as new machine, tooling, measurement system, transition to another plant site or area, etc.). DQR will finally ensure Process Capability indexes Cp & Cpk are computed for each KPC from a process determined to be in-control. Supplier is encouraged to use form QC spreadsheet that contains an Individuals and Moving Range (IX-MR) Control Chart, very commonly used in small lot size environments that can be used to collect the data, plot the points, and compute the process control limits and process capability indexes Cp & Cpk DQR REPORTING PRIOR TO SHIPPING: The supplier is required to upload SPC summary data for each KPC feature via the Process Certification Upload Tool available at for every manufactured lot (as designated by a Master ESIR). Upload snapshot data to the KPC database. If the Cpk for the snapshot data is less than 1.33, an Action Plan will be required. The Action Plan must be launched from the KPC database. DQR must ensure these reporting requirements are completed for the Master ESIR referenced on the ESIR generated for each shipment prior to providing an Accept response to the E-SILK question, Process certification is being performed as required for this lot ACHIEVING CERTIFICATION AND SUBSEQUENT KPC SAMPLING: A KPC feature is considered Certified when the CPK is equal to 1.33 or greater, a Process Control Plan (e.g., Electronic Site Specific Plan for HS defined KPCs) is completed, a Control Chart identified with statistical Page 28 of 43

29 control limits that shows a minimum of 25 consecutive data points (subgroups) of data are in a state of control and a self-audit plan is in place. There is no relief in sampling frequency for any feature designated KPC1. These features must maintain a 100% sampling frequency per HSC In the event a KPC2 feature achieves a certified status, sampling frequency may be reduced to.65 AQL per HSC REQUIREMENTS FOR DISTRIBUTORS, OFFLOAD SUPPLIERS AND SUPPLIER PROCURED CASTINGS/FORGINGS: The following situations arise when the KPC feature requiring Process Certification per HSC16199/UTCQR-09.1 for a CTQ Part and that feature is not produced by the 1 st -tier supplier who has the purchase order with HS: A) Distributors who buy the complete part from a manufacturer and subsequently sell that part to HS. B) 1st-tier supplier who contracts with a 2nd-tier supplier to provide a specific process step that produces the KPC feature of the CTQ Part the 1st-tier has the purchase order for with HS. C) 1st-tier supplier is mandated by HS part drawing to buy a casting and/or forging from a specific 2nd-tier supplier. The casting/forging supplier manufactures the casting/forging to a HS drawing that contains one or more CTQ Features (i.e., KPC2). In any of the defined events above, the 1 st -tier-supplier has the responsibility to flow-down the HSC16199/UTCQR-09.1 Process Certification requirement to the 2 nd -tier supplier. This responsibility is in direct alignment with the requirements specified in ASQR-01 relative to the flow-down of UTC requirements by a 1 st -tier supplier to a 2 nd -tier supplier Option 1: Direct Flowdown of HSC16199 Requirements st -tier supplier required to ensure 2 nd -tier supplier has a system capable of meeting HSC16199/UTCQR-09.1 requirements. Recommend 1 st -tier supplier use Supplier Process Certification System Assessment (Form QC ) available on Help tab, then Quality- MPR st -tier supplier will need to ensure the Page 29 of 43

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

INTRODUCTION: PURPOSE:

INTRODUCTION: PURPOSE: UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found

More information

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E 9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier

More information

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record

More information

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing

More information

Product Order Quality Requirements Meggitt (Orange County), Inc.

Product Order Quality Requirements Meggitt (Orange County), Inc. Product Order Quality Requirements Meggitt (Orange County), Inc. Reference QP8-051, Purchase Order Quality Requirements QP8-055, Review/Control Supplier Documentation PP-401, Quality Assurance Codes 50-2-351,

More information

TITLE: Control of Software

TITLE: Control of Software Page 1 of 8 TITLE: Control of Software WARNING This document is the property of United Technologies Corporation (UTC). You may not possess, use, copy or disclose this document or any information in it,

More information

2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System 1. Purpose This document defines requirements for suppliers providing aerospace and defense materials, products and services to Electromech Technologies. Supplier acceptance of a purchase order from Electromech

More information

Supplier Quality Requirements and Clauses

Supplier Quality Requirements and Clauses Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion

More information

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0

More information

ATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES

ATTACHMENT Q PURCHASE ORDER QUALITY CLAUSES 1 of 8 Q0. Instructions: Review your Purchase Order for any Q clauses listed below. Specific clauses other than Q0 apply only when listed on the PO. All certifications provided to CAI are to be complete,

More information

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Supplier Quality Requirements

Supplier Quality Requirements Key Elements Procedures # 2 Supplier Quality Requirements Section List of content Page 1.0 Foreword 2 2.0 Definitions and acronyms 2 3.0 Basic Quality Requirements 3 4.0 Part Specific Quality Requirements

More information

Purchase Order Clauses and Conditions

Purchase Order Clauses and Conditions Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:

More information

Chandler-Arrow Division Arrow Supplier Quality Requirements

Chandler-Arrow Division Arrow Supplier Quality Requirements AQR-1 QUALITY SYSTEM Supplier must maintain a quality system that meets, as a minimum, the requirements of ISO9001-2008, unless otherwise directed by Chandler-Arrow Division QA organization. Immediate

More information

Supplier Quality Assurance

Supplier Quality Assurance Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on

More information

CONTENTS Policies and Definitions... 1.0 Procedure... 2.0

CONTENTS Policies and Definitions... 1.0 Procedure... 2.0 CONTENTS Policies and Definitions..... 1.0 Procedure... 2.0 APPENDICES Change Notification..... 1 Training Requirements..... 2 Procedure Administration.... 3 1.0 POLICIES AND DEFINITIONS 1.1 Scope This

More information

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the

More information

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page

More information

EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10

EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10 EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10 EVALUATION AND ACCREDITATION OF TESTING FACILITIES USED BY SUPPLIER OF MATERIALS TO GENERAL MOTORS PREFACE TO GP-10 General Motors expects

More information

Supplier Requirements Manual M M 0 3

Supplier Requirements Manual M M 0 3 Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.

More information

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

PPI/TZ Standard Quality Requirements for Suppliers -SQRS- PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

GLOBAL AEROSPACE PROCEDURE

GLOBAL AEROSPACE PROCEDURE 1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to

More information

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet. INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary

More information

Supplier Quality System Requirements

Supplier Quality System Requirements Page 1 of 18 TITLE Supplier Quality System Requirements WARNING This document is the property of United Technologies Corporation (UTC). You may not possess, use, copy or disclose this document or any information

More information

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 Aerospace Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 The SPOC Manual is controlled in Electronic format as presented on the Supplier Portal and Honeywell Intranet.

More information

GE Power Electronics Business Total Quality Management for Suppliers

GE Power Electronics Business Total Quality Management for Suppliers GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

Bogue Machine Company, Inc. Business Instruction

Bogue Machine Company, Inc. Business Instruction Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

3.1 It is the responsibility of the Supplier to obtain current copies of non UTC documents noted below at www.sae.org.

3.1 It is the responsibility of the Supplier to obtain current copies of non UTC documents noted below at www.sae.org. Date: 1 of 21 TITLE UTC Production Part Approval Process (UPPAP) WARNING This document is the property of United Technologies Corporation (UTC). You may not possess, use, copy or disclose this document

More information

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared

More information

Ege Fren Ege Fren San. ve Tic. A.Ş.

Ege Fren Ege Fren San. ve Tic. A.Ş. Page : 1 / 8 1. Purpose: This manual is formed in order to create a business environment based on a partnership understanding with our suppliers, determine and develop our relationships in this context

More information

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts Approved By: Elliott Major Date: 11-19-09 Page 1 of 9 Rev ECO Date Approve Rev ECO Date Approve A R01_13541 07-23-10 DWL B R01_14787 12-15-11 DWL C R01_14910 03-07-12 DWL D R01_14964 04-16-12 DWL 1.0 Purpose

More information

Quality Requirements for Suppliers

Quality Requirements for Suppliers ESC9100 Rev D Quality Requirements for Suppliers This document is the property of The United Technologies Aerospace Corporation and is loaned with the understanding that neither this document, nor any

More information

QP-740. Supplier Management Handbook

QP-740. Supplier Management Handbook QP-740 Supplier Management Handbook Revision H Revision Date Reason Signature - 2/02/08 Initial Release Avis Rosenfield A 12/10/10 Complete update Ritchie Lacson B 4/14/11 Add sections: 6.4, 6.5, 9.9,

More information

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE 1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior

More information

Gulfstream Production Certificate Operations

Gulfstream Production Certificate Operations SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.

More information

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office

More information

VENDOR QUALIFICATION APPROVAL FORM

VENDOR QUALIFICATION APPROVAL FORM COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit:

More information

Quality Control Procedures QCP 5.4 Page 1 of 5

Quality Control Procedures QCP 5.4 Page 1 of 5 Quality Control Procedures QCP 5.4 Page 1 of 5 1.0 PURPOSE 2.0 SCOPE SOURCE INSPECTION To establish a system for Source Inspection of material supplied to Eaton Corporation, FSD, Euclid. This procedure

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Pacific Gas and Electric Company

Pacific Gas and Electric Company Pacific Gas and Electric Company Supplier Quality Assurance Mission Statement Our mission is to assure that PG&E has a robust quality program that quantitatively measures supplier performance and drives

More information

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Quality Supplier Requirements for Beckwith Electric Co., Inc. Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality

More information

Supplier Quality Requirements F16 Program

Supplier Quality Requirements F16 Program ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY

More information

AMETEK Airtechnology Group Ltd

AMETEK Airtechnology Group Ltd Page 1 of 16 AMETEK Airtechnology Group Ltd Locations: Airscrew Muirhead Aerospace Traxsys Input Products 111 Windmill Road, Sunbury on Thames, Middlesex, TW16 7EF Oakfield Road, Penge London SE20 8EW

More information

Quality Assurance QUALITY ASSURANCE PLAN

Quality Assurance QUALITY ASSURANCE PLAN Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File

More information

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT

More information

PERFORMANCE EXCELLENCE Procurement Standards

PERFORMANCE EXCELLENCE Procurement Standards PERFORMANCE EXCELLENCE Procurement Standards AEROSPACE PRODUCTS Agile Revision: D Sparton Quality Policy: It is the goal of Sparton Corporation and it subsidiaries ( Sparton ) to deliver value through

More information

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ Manufacturers have worked to meet the stringent requirements of AS9100 for decades; the recent introduction of Revision C has further expanded

More information

How To Manage A Plant

How To Manage A Plant MALAT 9100 QUALITY REQUIREMENTS For Suppliers of Category 12, 13 This Document is located in the Internet site http://www.iai.co.il/sip_storage/files/2/35782.pdf Date: March 2012 Prepared by : S. Migdal

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

Introduction. Cooper Standard Global Supplier Quality Manual Page 2 of 11

Introduction. Cooper Standard Global Supplier Quality Manual Page 2 of 11 Global Supplier Quality Manual Revision 3 Introduction 1. Purpose: This manual has been created for Cooper Standard s (CS) Production, Prototype and Service Suppliers. The manual includes all CS locations

More information

Purchase Order Attachment 1600 Revision 02 June-2006. Raytheon Aircraft Company Supplier Quality Requirements Document

Purchase Order Attachment 1600 Revision 02 June-2006. Raytheon Aircraft Company Supplier Quality Requirements Document Purchase Order Attachment 1600 Revision 02 June-2006 Raytheon Aircraft Company Supplier Quality Requirements Document Issued by: Raytheon Aircraft Company Supply Chain Management Quality Assurance 101

More information

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).

More information

How To Ensure Quality Assurance

How To Ensure Quality Assurance 1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

Fokker Aerostructures B.V. Quality Procurement department

Fokker Aerostructures B.V. Quality Procurement department Fokker Aerostructures B.V. Quality Procurement department This docum ent is published by the Procurem ent Qualit y Departm ent of Fokker Aerostructures B.V. Exhibit B;Qualit y Issue:20 March 2012-02 Class:B2enP&W

More information

SUPPLIER QUALITY SYSTEM AUDIT

SUPPLIER QUALITY SYSTEM AUDIT Company Name: Date: Company Address: Quality Assurance Mgr: President: Number of employees: Is your company receptive to source inspection? List all standards the quality system is based on Web Page: Company

More information

Management System Procedure. 4.06 30 004 N 4/01/2012 2 of 14

Management System Procedure. 4.06 30 004 N 4/01/2012 2 of 14 4.06 30 004 N 4/01/2012 2 of 14 TABLE OF CONTENTS 1. Introduction 1.1 Policy and Vision 1.2 Purpose 1.3 Scope 1.4 Responsibility 2. Quality System Requirements 2.1 ISO/TS 16949: 2009 and Alternatives 2.2

More information

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and

More information

QUALITY CONTROL MANUAL

QUALITY CONTROL MANUAL QUALITY CONTROL MANUAL TABLE OF CONTENTS PREFACE I II III IV Title Page Table of Contents Information Page Revision Log SECTION DESCRIPTION 1.0 Introduction 2.0 Organization 3.0 Organization Chart 4.0

More information

First Article Inspection (FAI) Training

First Article Inspection (FAI) Training First Article Inspection (FAI) Training What is the purpose an FAI? The purpose of the First Article Inspection is to provide objective evidence that all engineering design and specification requirements

More information

EN 4179/NAS 410 Interpretation

EN 4179/NAS 410 Interpretation EN 4179/NAS 410 Interpretation The NANDTB has adopted NAS 410 / EN 4179 in lieu of AS 3669 as the standard for the qualification and approval of NDT technicians. Employers applying these standards sometimes

More information

Quality Management System Manual Revision L

Quality Management System Manual Revision L This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

SUPPLIER QUALITY PROGRAM, V (U)

SUPPLIER QUALITY PROGRAM, V (U) FEDERAL MANUFACTURING & TECHNOLOGIES PQR 1060 PAGE 1 OF 17 SUPPLIER QUALITY PROGRAM, V (U) CHANGE HISTORY ISSUE DESCRIPTION OF CHANGE AUTHOR DATE E CORRECTED CHANGE HISTORY S. L. HALTER 10/18/2000 F UPDATED

More information

Generic CMMS Quality Assurance Plan

Generic CMMS Quality Assurance Plan Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)

More information

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM Fuji Autotech USA, LLC Walton, KY 41094 DATE: SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM DUNS# Supplier Name Complete Mailing Address Complete Shipping Address (if different then mailing address)

More information

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1 Designation: E 1212 99 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Practice for

More information

Delegated Quality Actions Requirements KJ-14. Compiled by: Responsible for the Process: Approved by: Filip Zieliński

Delegated Quality Actions Requirements KJ-14. Compiled by: Responsible for the Process: Approved by: Filip Zieliński Spółka z ograniczoną odpowiedzialnością ul. Wojska Polskiego 3 39 300 Mielec www.pzlmielec.pl Delegated Quality Actions KJ-14 Compiled by: Responsible for the Process: Approved by: Anna Ochalik Filip Zieliński

More information

ONTIC UK SUPPLIER QUALITY SURVEY

ONTIC UK SUPPLIER QUALITY SURVEY MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return

More information

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier: Plant/Location: Date: Audit Team: Scope of Audit: Number of C.A.R. s: Corrective Action Due: Potential suppliers

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information

PRODUCT CERTIFICATION REQUIREMENTS

PRODUCT CERTIFICATION REQUIREMENTS PRODUCT CERTIFICATION REQUIREMENTS SIRIM QAS International Product Certification Page 1 of 14 QUALITY SYSTEM 1. GENERAL 1.1 This document defines the responsibilities and obligations of the Licensee with

More information

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008 WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,

More information

Cartel Electronics. AS 9100 Quality Systems Manual

Cartel Electronics. AS 9100 Quality Systems Manual Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

AVNET Logistics & EM Americas. Quality Manual

AVNET Logistics & EM Americas. Quality Manual AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished

More information

UL Qualified Firestop Contractor Program Requirements April 2012

UL Qualified Firestop Contractor Program Requirements April 2012 UL Qualified Firestop Contractor Program Requirements April 2012 For more information, please contact your local UL Field Representative INTRODUCTION: In order for a firestop systems installer/contractor

More information

Purchase Order Clauses

Purchase Order Clauses Purchase Order Clauses Supplier are requested to comply with all of following quality clauses, additional clauses are listed with the purchase order as determine by Impresa Aerospace LLC. (IA.). Buyer

More information

074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements Page 1 of 7 Software Supplier Process Requirements 1.0 QUALITY SYSTEM FRAMEWORK 1.1 QUALITY POLICY The Seller shall document and implement a quality program in the form of Quality manual or detailed Quality

More information

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page 7/11/12 Supplier Quality 1 of 18 7/11/12 Supplier Quality 2 of 18 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management

More information

PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE Supplier Performance Manual REVISION L December 7, 2015

PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE Supplier Performance Manual REVISION L December 7, 2015 APPROVAL Procedure Section Process Owner Approval 1.0 Letter of Introduction 2.0 Global Competitiveness 3.0 Supply Chain Contact List 4.0 Quality Policy Statement 5.0 Quality Systems Qualifications 6.0

More information

Camar Aircraft Parts Co. Procedures Manual

Camar Aircraft Parts Co. Procedures Manual QUALITY ASSURANCE PROCEDURES INDEX Procedure Number Approval Procedure Title 4.2.3 R.F. Control of Documents 4.2.4 R.F. Control of Records 6.2.2 R.F. Competence, Training and Awareness 6.4 R.F. Foreign

More information

Q2A First Article Inspection (FAI) AS9102

Q2A First Article Inspection (FAI) AS9102 Page 1 of 7 Q2A First Article Inspection (FAI) AS9102 A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network.

More information

Supplier Handbook Terms and Conditions

Supplier Handbook Terms and Conditions * 2 / 7 TABLE OF CONTENTS 1. Section 1 Introduction 1.1. Objective 1.2. Scope 1.3 Contact Information 2. Section 2 Quality Expectations 2.0 Application of This Section 2.1 Change Notification 2.2 Quality

More information

BOEING DEFENSE, SPACE AND SECURITY ST. LOUIS REQUIREMENTS FOR SUPPLIER MATERIAL REVIEW AUTHORITY (MRA) Revision date 14 May 2010 Revision Letter D

BOEING DEFENSE, SPACE AND SECURITY ST. LOUIS REQUIREMENTS FOR SUPPLIER MATERIAL REVIEW AUTHORITY (MRA) Revision date 14 May 2010 Revision Letter D BOEING DEFENSE, SPACE AND SECURITY ST. LOUIS REQUIREMENTS FOR SUPPLIER MATERIAL REVIEW AUTHORITY (MRA) Revision date Revision Letter D Issue date 23 January 1996 Contract Number N/A Prepared by

More information

SUPPLIER QUALITY MANAGEMENT SPECIFICATION MANUAL

SUPPLIER QUALITY MANAGEMENT SPECIFICATION MANUAL SUPPLIER QUALITY MANAGEMENT SPECIFICATION MANUAL 1. PURPOSE SCM 502 Issued: 02/20/06 Revision: 20 Page: 1 of 12 DISTRIBUTOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.1 This specification stipulates the

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014 ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) 1.0 INTRODUCTION June 2014 1.1 Purpose: The purpose of this acceptance criteria is to establish requirements for information that is provided to ICC-ES

More information

MSC Group Chain of Custody (CoC) Guidance for Non-Reduced Risk Groups

MSC Group Chain of Custody (CoC) Guidance for Non-Reduced Risk Groups MSC Group Chain of Custody (CoC) Guidance for Non-Reduced Risk Groups 1. About this document This document is a non-normative guidance document intended to help companies understand CoC requirements. The

More information

Only the online system has the current version. Verify hard copy against online system before use. VWI 7.4.051

Only the online system has the current version. Verify hard copy against online system before use. VWI 7.4.051 1 of 7 Subject: PREFERRED PERFORMER PROGRAM - SUPPLIER INSTRUCTIONS AND PROGRAM CONTROL REQUIREMENTS Supersedes ; dated 02/19/14 Process Owner Supply Chain Governance Applies To Triumph Aerostructures

More information